return to:  www.jasSILKS.com

The Powerhouse at Churchill Falls

The underground tunnel system used to access the generator etc.. The tunnel is about 1 1/2 miles long and runs on a gradual slope to the the surface just above the Tail Race.

The underground tunnel system used to access the generator etc.. The tunnel is about 1 1/2 miles long and runs on a gradual slope to the the surface just above the Tail Race.




return to:  www.jasSILKS.com